BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brewton, Alabama. Completed plans call for site work for a water / sewer project.

Furnishing all labor and materials and performing all work for construction of a: new water supply well on pea ridge road in association with provalus. The project consists of a new test and production well including site work, building, electrical, etc. And related appurtenances. Printed copies of the bidding documents may be obtained from the issuing office, during the hours indicated above, upon payment of $20.00 for electronic files and/or $100.00 for each printed set. Said cost represents the cost of printing, reproduction, handling, and distribution, therefore no refund will be granted. Checks for bidding documents shall be payable to "Goodwyn, mills & cawood, inc." partial sets of bidding documents will not be available from the issuing office. No partial sets, individual pages or drawing sheets will be provided. No documents will be issued within 48 hours prior to bid opening. Bid security shall be furnished in accordance with the instructions to bidders. All bidders must comply with the president's executive order number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title vi of the civil rights act of 1964, the davis-bacon act, the anti-kickback act and the contract workhours act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, section 3, segregated facilities, section 109 and e.O. 11246. The owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with requirements of the contractor's licensing law of the state of alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the information for bidders. All contractors preparing bids for the referenced project shall submit a list of similar projects "Successfully completed" in the last 5 years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current alabama general contractor's license, evidence (with original seal of the state of alabama) of proper registration with the alabama secretary of state as a foreign corporation, and a certificate of good standing as a foreign corporation from the state of alabama department of revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. Guarantee will be required with each bid for at least 5% if the amount of the bid filed in the form of a certified check, bid bond, or irrevocable letter of credit acceptable to the owner payable to the city of brewton, al. Bid bonds shall include certification that the bonding company is listed in circular 570 of the u.S. Treasury department. The name, address, telephone number, and contact person for the bonding company shall also be included. No bidder may withdraw his bid within 60 days after the opening thereof. Bids may be held by the owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded in part by cdbg project no.: lr-ed-pf-17-002 and lr-ed-pf-14-102, eda project no.: 04-01-07272, and dra project no.: al-51084. All entities participating in federally funded projects are to be registered in sam (system for award management) www.Sam.Gov . "Prospective bidders must provide proof of active sam status with their bid." the successful bidder will be required to submit 100% performance and payment bonds or an irrevocable "Letter of credit" which is acceptable to the owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of bidders is called to the license required by title 34, chapter 8, of the code of alabama, 1975, and amendments thereto, relating to the licensing of general contractors. No bid will be accepted from anyone, except a qualified contractor, licensed by the state licensing board for general contractors, unless otherwise required by the state licensing board. Each bidder must put his license number, category, and license expiration date on the outside of his sealed envelope. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address and name of the project. Envelopes containing bids must be addressed as follows, and delivered to yancey e. Lovelace, mayor, city of brewton, 1010-a douglas avenue, brewton, al 36426 or p. O. Drawer 368, brewton, al 36427: "Bid for new water supply well on pea ridge road in association with provalus - cdbg project no.: lr-ed-pf-17-002 and lr-ed-pf-14-102, eda project no.: 04-01-07272, and dra project no.: al-51084. The city of brewton, al is an equal opportunity employer and encourages the participation of women and minority owned businesses (ombes) and section 3 qualified contractors in all project contract procurements. Yancey e. Lovelace, mayor city of brewton 1010-a douglas avenue brewton, alabama 36426

Award

Water / Sewer

$1,614,105.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
25
Bidding Soon
469
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2020

June 2, 2020

img_map_placeholder

Pea Ridge Rd, Brewton, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.