BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Dothan, Alabama. Completed plans call for the construction of a 26,000-square-foot, two-story above grade fire / police facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; for outdoor lighting for a road / highway; and road / highway.

Station #10: 2215 West Main Street, Dothan, Alabama 36301 Station #3: 1484 Whatley Drive, Dothan, Alabama 36303 Cashier's check or bid bond payable to City of Dothan, Alabama in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds, immigration documentation as required by The Beason-Hammon Alabama Taxpayer and Citizen Protection Act, and insurance in compliance with requirements, will be required at the signing of the Contract. Only General Contractors who have completed the pre-qualification process within the stated time limits, and which are properly licensed in accordance with criteria established by the State Licensing Board for General Contractors under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, will be considered for pre-qualification for the Work of this project. The pre-qualification procedure is intended to identify responsible and competent bidders relative to the requirements of the Project. The Owner reserves the right to waive technical errors in applications or abandon the pre-qualification process. General Contractors will be notified of pre-qualification to bid on or before Wednesday, March 8, 2023, at which time plans will be available for distribution per above requirements. The project consists of two (2) single-story, new construction fire stations at approximately 13,000 square feet each and will house a 3-engine apparatus bay, sleeping quarters, kitchen, dayroom, office space, and miscellaneous equipment and living facilities. Site work will include grading, driveways, parking lots, sidewalks, privacy fencing, and site lighting. The project will also include, as alternates, a 3rd engine bay at Station #10, a Community Education Room at Station #10, and a combined landscaping package for both stations. All questions, comments and requests for clarifications or additional information shall be submitted in writing to Project Architect Tony Coleman, AIA, at Seay, Seay, and Litchfield, P.C. Any and all comments, questions and requests for clarifications must be received no later than 5:00 PM CST 4/5/2023 5:00 PM

Award

Fire / Police

$11,713,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
22
Bidding Soon
449
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

May 4, 2023

img_map_placeholder

Multiple Locations, Dothan, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.