BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2019 at 8:00 PM

Updated September 15, 2023

Renovation of a mixed-use development in San Antonio, Texas. Completed plans call for the renovation of a service station / car wash facility.

The University of Texas at San Antonio received a grant from the Texas Commission for Environmental Quality (TCEQ) to upgrade the existing Compressed Natural Gas (CNG) fueling station at the UTSA West Campus. Construction will include but is not limited to replacing the existing 3,000-PSI natural gas compressor skid with a new 4,000-PSI natural gas compressor skid including new filter and dryer. Install new fueling post dispenser with associated hoses and piping. University estimates that the Project will take approximately two hundred ten (210) days to complete, and University desires to have the Project completed by such time. The University of Texas at San Antonio received a grant from the Texas Commission for Environmental Quality (TCEQ) to upgrade the existing Compressed Natural Gas (CNG) fueling station at the UTSA West Campus. Construction will include but is not limited to replacing the existing 3,000- PSI natural gas compressor skid with a new 4,000-PSI natural gas compressor skid including new filter and dryer. Install new fueling post dispenser with associated hoses and piping. A Proposal Security Bond is not required. Any questions or concerns regarding this Request for Proposal shall be directed to: Karen Krueger Guerrero, Sr. Procurement Specialist UTSA Purchasing Department The University of Texas at San Antonio One UTSA Circle San Antonio, Texas 78249 Phone: (210) 458-4974 Fax: (210) 458-4061 E-mail: Karen.kruegerguerrero@utsa.edu. University specifically instructs all interested parties to restrict all contact and questions regarding this RFP to written or e-mailed communications forwarded to the above-named contact person. All questions or concerns must be received by the above-named person University shall have a reasonable amount of time in which to respond to questions or concerns by fax, e-mail or U.S. Postal Service. After the conference, prospective Respondents may submit written questions until 5:00 PM CDT, on August 21, 2019. University will not accept questions after that time. University is not obligated to respond to each question (ref. Sections 2.4, 2.5), and only responses designated as formal Addenda to the RFP will be binding on University (ref. Section 2.5). However, if University decides to answer questions in writing, then University will fax, mail, or e-mail copies of those questions and answers to the addresses provided by each entity to which University sent an RFP or which notified University that it obtained an RFP, pursuant to Section 2.5. Deadline to Respond to Questions August 22, 2019. All agencies of the State of Texas are required to make a good faith effort to assist historically underutilized businesses (each a HUB) in receiving contract awards. All vendors, including State of Texas certified Historically Underutilized Businesses (HUBs), MUST submit a HSP with their proposal. Failure to correctly complete and return the HSP form will result in disqualification of the vendor's proposal from consideration for award. You may contact Bruce Williams, UTSA HUB Program Manager, at 210-458-6491 or via email at bruce.williams@utsa.edu if you have any questions about the HSP.

Post-Bid

Service Station / Car Wash

$300,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
107
Bidding Soon
2,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2019

October 7, 2019

Project location map

14333 Babcock Rd, San Antonio, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.