BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2022 at 8:00 PM

Updated August 29, 2025

Site work, new construction and renovation of a pre-engineered storage facility in San Antonio, Texas. Completed plans call for the construction of a pre-engineered storage facility; for the renovation of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Sealed proposals are requested by the San Antonio Water System for the construction and improvements of the electrical, power systems, and instrumentation and controls (I&C) system for the Steven M. Clouse Water Recycling Center (SMC WRC). The work consists of improvements to the plant's 15 kV electrical distribution system to support other equipment to be installed; electrical and I&C improvements to the first stage aeration area, replacement of existing DCS with new PLCs, construction of prefabricated buildings and associated foundations to house motor control centers and control equipment; installation of duct banks and extension of the plant wide fiber optic communication network; field instrumentation and programming required to connect to the Rockwell PlantPAx system; installation of workstations in the SMC WRC; and, all other associated improvements as described in the Contract Documents for the Steven M. Clouse WRC Electrical System Improvements - Phase 2B Project. For questions regarding this solicitation, technical questions or additional information, please contact Roxanne Lockhart, Contract Administrator, in writing via email to: roxanne.lockhart@saws.org or by fax to 210- 233-4438 until 4:00 PM (CDT) on August 5, 2022. Answers to the questions will be posted to the web site by 2:00 PM (CDT) on August 15, 2022 as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. The aspirational SMWVB goal is 20% of your total Price Proposal

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$17,000,000.00

Public - City

New Construction, Renovation, Site Work

230

31

10

7

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
108
Bidding Soon
2,058
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

December 5, 2022

Project location map

3495 Valley Rd, San Antonio, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.