BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2020 at 8:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a road / highway; water / sewer project; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project has been rebid. **As of February 19, 2020 This project has not yet been awarded. A timeline for award has not yet been established.** The proposed project will continue previous phases by widening Seeling Channel and reconstructing adjacent street(s). The project will mitigate drainage issues and increase safety and mobility within the project area. The Project is a continuation of multi-phased floodplain improvements of Seeling Channel with limits from Morning Glory to upstream of St. Cloud and will include the reconstruction and widening of Seeling Channel and adjacent street(s) along with improvements to curbs, sidewalks and driveway approaches as needed. Additionally, two (2) alternates are also being proposed: 1. Reconstruction of W. Mulberry Avenue from St. Cloud to Morning Glory to include curbs, sidewalk and driveways 2. Summit Alley Drainage: In the alley located between Summit and Beverly, residents have reported localized drainage issues of storm runoff entering their property. Drainage flumes are being proposed to reduce the amount of storm water runoff entering affected properties. Calendar Days: Respondent understands and agrees that this is a 22 month construction contract (660 days). This three percent (3%)subcontracting goal will also count toward the aforementioned twenty-one percent (21%) M/WBE subcontracting goal. The estimated budget for this contract is $12,416,700.00. Contract Budget: The estimated budget for this contract is $15,080,000.00. Deadline for Submission of Written Questions: Tuesday, April 7, 2020 at 4:00p.m. CST. *This project timeline has been extended due to the public health crisis. Project no - ASA18-047-00

Post-Bid

Water / Sewer

$15,080,000.00

Public - City

Paving, Site Work

Subscribe For Documents

130 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
43
Bidding Soon
2,201
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2020

June 29, 2020

Project location map

Multiple Locations, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.