BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a road / highway; water / sewer project; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project has been rebid. **As of February 19, 2020 This project has not yet been awarded. A timeline for award has not yet been established.** The proposed project will continue previous phases by widening Seeling Channel and reconstructing adjacent street(s). The project will mitigate drainage issues and increase safety and mobility within the project area. The Project is a continuation of multi-phased floodplain improvements of Seeling Channel with limits from Morning Glory to upstream of St. Cloud and will include the reconstruction and widening of Seeling Channel and adjacent street(s) along with improvements to curbs, sidewalks and driveway approaches as needed. Additionally, two (2) alternates are also being proposed: 1. Reconstruction of W. Mulberry Avenue from St. Cloud to Morning Glory to include curbs, sidewalk and driveways 2. Summit Alley Drainage: In the alley located between Summit and Beverly, residents have reported localized drainage issues of storm runoff entering their property. Drainage flumes are being proposed to reduce the amount of storm water runoff entering affected properties. Calendar Days: Respondent understands and agrees that this is a 22 month construction contract (660 days). This three percent (3%)subcontracting goal will also count toward the aforementioned twenty-one percent (21%) M/WBE subcontracting goal. The estimated budget for this contract is $12,416,700.00. Contract Budget: The estimated budget for this contract is $15,080,000.00. Deadline for Submission of Written Questions: Tuesday, April 7, 2020 at 4:00p.m. CST. *This project timeline has been extended due to the public health crisis. Project no - ASA18-047-00

Post-Bid

Water / Sewer

$15,080,000.00

Public - City

Paving, Site Work

Subscribe For Documents

130 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2020

June 29, 2020

img_map_placeholder

Multiple Locations, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.