Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, outdoor lighting, renovation and addition to a mixed-use development in Burnet, Texas. Working plans call for the renovation of a educational facility; for the addition of a educational facility; for site work for a playground / park / athletic field; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and road / highway.
Proposition A will cover facility improvements and accommodations for student growth. Schools include Bertram Elementary School, RJ Richey Elementary School, Shady Grove Elementary School, Burnet Middle School, Burnet High School, Quest High School, and other district improvement projects. Bertram Elementary School A. New 2-story classroom wing, increasing campus capacity to 700 students B. Add connecting corridors C. Renovate Activity Building, classrooms, and Nurse’s station. D. Replace flat roofs E. Expand and repair parking lot F. Repair Activity Building stucco G. Reconfigure walking track H. Replace windows in the gym Throughout the campus: Replace HVAC in cafeteria and gym, new parking lot lights, replace ducts and dampers in the Activity Building RJ Richey Elementary School A. Add security fencing around playground B. Replace roof penetrations and re-coat gym roof C. Repair drainage issues D. Install aluminum canopy at bus pick-up area E. Add a walking track F. Renovate Nurse’s station and improve air quality G. Improve the front drive and drop-off/pick-up areas H. Add aluminum canopy to front drive Throughout the campus: Replace carpet and VCT flooring Shady Grove A. Renovate Nurse’s Station and improve air quality B. Add parent and visitor queue at front entrance C. Add two student small group rooms D. Add security fencing around playground E. Install new swings, mulch, and ADA accessibility to playground F. Add safety windows to 2 exterior doors G. Add a walking track Burnet Middle School A. Improve acoustics in the circular building B. Replace roof fasteners and coating to address leaks C. Cover exposed wall insulation in 6th grade gym and auxiliary gym D. Repair cracked sidewalks E. Add Life Skills restrooms F. Renovate Auditorium restrooms G. Renovate space to a nurse’s station and improve air quality Throughout the campus: Replace certain aging HVAC units, install damper system to Administration Area, add ceramic wainscoting in hallways, replace flooring, and replace room signage Burnet High School A. New weight room/locker rooms for boys and girls B. Replace the press box with prefabricated one (no elevator required) C. Install turf at baseball and softball fields Quest High School A. Update fire alarm system B. Install bird control measures at the pavilion C. Replace roof only where noted on the graphic D. Cover exposed wall insulation in Gym Other District Improvement Projects A. Widen Bulldog Drive and the “s” curve bridge B. Add parking along Bulldog Drive C. Repair the 3-way stop D. Expand stadium parking E. New replacement buses F. Add a parking lot for Transportation employees and pave the Transportation access road G. Seal coat existing parking lots H. Add Band Instruments, HVAC Replacements, Rubber Flooring at Playgrounds, and Classroom Furniture As of January 11, 2022 the construction manager and designer have been selected. A firm construction timeline for this project has not yet been released.
Pre-Construction/Negotiated
Educational
$27,496,000.00
Public - City
Addition, Demolition, Outdoor Lighting, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2022
Multiple Locations, Burnet, TX
Related To This Project
Burnet, TX
Bid Date: Mar 04 2022
Burnet, TX
Bid Date: Feb 15 2022
Burnet, TX
Bid Date: Mar 30 2022
Burnet, TX
Bid Date: May 06 2022
Burnet, TX
Bid Date: Aug 24 2023
Burnet, TX
Bid Date: Aug 24 2023
Burnet, TX
Bid Date: Sep 28 2023
Burnet, TX
Bid Date: Feb 15 2022
Burnet, TX
Bid Date: Nov 04 2021
Burnet, TX
Bid Date: Nov 09 2021
Burnet, TX
Bid Date: May 12 2021
Burnet, TX
Bid Date: Feb 15 2022
Burnet, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.