BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2024 at 8:00 PM

Updated February 14, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Everett, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project awarded to IMCO General Construction in the amount of $25,004,258.50. Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct the replacement for the Edgewater Creek Bridge. This includes constructing the replacement of the existing bridge, retaining walls, regrading and paving adjacent streets, landscaping, signage, channelization, illumination, stormwater conveyance, stormwater flow control, temporary traffic control and performing all Work as required by the Contract Documents. The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder may withdraw its Bid after the hour set for the opening thereof except as may be provided in the Contract Documents. The City further reserves the right to make the bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for a period offorty-five (45) days after bid opening. The engineer's estimate for this Project is $25,700,000.

Award

Bridges / Tunnels

$25,004,259.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
91
Bidding Soon
1,863
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

February 19, 2024

Project location map

W Mukilteo Blvd, Everett, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.