Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2024 at 8:00 PM
Updated January 29, 2025
Site work for a water / sewer project in Pickering, Ontario. Design plans call for site work for a water / sewer project.
The Primary Trunk is the segment of the York Durham Sewage System (YDSS) starting from the intersection of Finch Avenue and Liverpool Road (Southeast Collector (SEC)) in the City of Pickering and discharging to the Diversion Chamber within the Duffin Creek WPCP. The Primary Trunk is approximately 5km long, the diameter ranges between 2642mm and 3000mm. TIMELINE: Municipal Class Environmental Assessment and public consultations are ongoing. Engineer will also complete Preliminary Design. Updates may be available fall, 2024. *Cost is shared between the Region of York & the Region of Durham.
Design
Water / Sewer
$10,000,000.00
Public - County
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
