Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 14, 2026

New construction and addition to a mixed-use development in Pickering, Ontario. Conceptual plans call for the construction of a 50,000-square-foot, two-story above grade clubhouse / community center; 45,000-square-foot, two-story above grade, two-story below grade, 435-space library; 40,000-square-foot, two-story above grade, one-story below grade, 120-space theater / auditorium; for the addition of a 38,000-square-foot, two-story above grade municipal facility; two-story above grade, two-story below grade, 300-space parking garage; and four-story below grade, 400-space parking garage.

Future Phases for the Pickering City Centre Project are as follows: Phase 2 - Relocate the Bell vault, move Esplanade South, construct the integrated 45,000 sq ft Library and SYC, sell air rights for residential development, construct below grade parking for both. Net Project Cost approx. 116.3 million). Phase 3 - Update the City Hall façade, renovate the current Library site for administrative expansion (2029, Net Project Cost - approx. 16 million). Phase 4 - Construct the PAC (Pickering Arts Centre), update the CHRDC (Chestnut Hill Developments Recreation Complex) façade, construct below grade parking, and construct new CHDRC parking (2030-2031, Net Project Cost - approx. 115.5 million). TIMELINE: Conceptual planning is ongoing. Phase 1 for a Park is now in design with MJMA Architecture & Design; details are followed on a separate report. Phase 2 has been deferred upon completion of the Seaton Recreation Complex and Library. An RFQ for a contractor has been issued; details are also followed on a separate report. Timelines to proceed with future phases of the project have yet to be identified by the city of Pickering. Further update summer 2027. *Estimated values are subject to change as the project advances.

Conceptual

Clubhouse / Community Centers

$247,800,000.00

Public - City

Addition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
246
Bidding Soon
4,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2021

September 4, 2028

Project location map

Glenanna Rd, Pickering Prkwy, Valley Farm Rd, Pickering, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed