BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Sainte-Sophie-de-Levrard, Quebec. Completed plans call for the addition of a 5,616-square-foot, one-story above grade clubhouse / community center; for site work for a clubhouse / community center; for the renovation of a clubhouse / community center; and for the demolition of a clubhouse / community center.

Reference number : 1812947 Deadline for receiving complaints: 2024-03-01 Electronically transmitted submission accepted: Yes, via the SEAO, with a document The Municipality of Sainte-Sophie-de-Levrard is requesting bids from general contractors to provide the labor, materials, equipment and supervision necessary for the execution of the transformation and expansion work of the Sainte-Sophie-de-Levrard church as a community center. For a good understanding of the project and the work required, you will notice that this project is divided into two distinct phases. The first phase, linked to this mandate, consists briefly of: Carrying out demolition work, including the two existing access points annexed to the building, including the emergency exit (metal ramp and staircase); Construction of the two extensions which will be annexed to the existing building; Construction of a sanitary space and an additional mechanical room in the basement; Installation of new service pipes including an electrical and communications pipe buried to the building; Carrying out work to bring heating, electricity and fire protection up to standard, as well as work to facilitate universal accessibility to the two expansions; Carrying out certain selective landscaping work. The second phase, outside the contract, mainly concerns the interior and exterior restoration of the existing building and the renovation of the three (3) existing rooms. The scope of the work of the said mandate of this call for tenders only concerns that of the first phase. However, the contractor must consider that all work to be carried out must take into consideration the work of the second phase with the aim of not generating additional costs linked to work carried out in the first phase which must be modified or demolished to allow the completion of the second phase, for the various disciplines.

Post-Bid

Clubhouse / Community Centers

$8,549,877.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
80
Bidding Soon
1,572
All Active Projects
655
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 2, 2024

May 17, 2024

November 1, 2024

img_map_placeholder

174 Rang St Antoine, Sainte-Sophie-de-Levrard, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.