Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 14, 2025
Demolition, site work, paving and new construction of a civil project in Menallen Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This Project Consists of the Replacement of a Box Culvert Along Sr 0034-046, Including Minor Approach Work, Guide Rail Updates, and Other Miscellaneous Construction, All as Indicated on the Approved Drawings Included in the Bid Package for State Route 0034, Section 046, in Adams County, Menallen Township, From Segment 0240 Offset 2648 to Segment 0250 Offset 0126, for an Overall Project Length of 500.00 Linear Feet (0.095 Mile). Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 41.00% Pre-bid Meeting: None Anticipated Ntp: 04/28/2025 Wage Rates: Yes Required Completion: 11/06/2026 Prequalification Requirement: Yes Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. State Type of Work: Bridge Replacement PennDOT - Carlisle Road Bridge 4 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work is: Removal of organic matter within excavation areas and removal of the first 8 inches of topsoil and organic matter within embankment areas. Removal of organic matter such as all trees, stumps, brush, roots, and other vegetation within the limits of excavation and embankment areas, including ditches and channels. When indicated, perform tree trimming and selective tree removal outside of the limits of excavation and embankment areas as specified in Section 810. Removal of objectionable material, rubbish, and junk within the project limits. Removal of buildings and structures, fences, walls, guide rail posts, guide rails, signs, direction markers, and other obstructions interfering with the work that are not included in other contract items. Disposal of removed material. Salvaging, temporarily storing, and delivering of material. Obtaining of waste areas for disposal of material as specified in Section 105.14. Stockpiling of topsoil and topsoil mixture as specified in Section 801. Chipping and stockpiling wood waste material, if specified in the Special Provisions. The eTicketing system must be fully integrated with the load read-out system at the plant and capable of transmitting ticket information to the PennDOT eTicketing system. The system software and hardware must prevent alteration of the data inputs from the asphalt mixing plant's recording truck scale or recording weigh hopper, or the asphalt mixing plant's recording aggregate, asphalt, and other material scales. This work is the overexcavation below the bottom of the culvert bedding specified on the plans and backfilling below the bearing elevation with No. 57 coarse aggregate, No. 8 Coarse aggregate, or an approved equal, to provide a uniform surface of competent bearing material. MATERIAL - Coarse Aggregate - AASHTO No. 57, Pub 408 - Section 703.2 Coarse Aggregate - AASHTO No. 8, Pub 408 - Section 703.2 This work is furnishing, placing, maintaining, adjusting, resetting, and removal of the temporary cofferdam and pump bypass system as shown on the Erosion and Sediment Pollution Control Plans. This work is providing an eTicketing system for aggregate deliveries to an ECMS construction project, to report individual and cumulative loads of material delivered during the construction process. This work is providing an eTicketing system for concrete deliveries to an ECMS construction project, to report individual and cumulative loads of material delivered during the construction process. This work is: Removal of organic matter within excavation areas and removal of the first 8 inches of topsoil and organic matter within embankment areas. Removal of organic matter such as all trees, stumps, brush, roots, and other vegetation within the limits of excavation and embankment areas, including ditches and channels. When indicated, perform tree trimming and selective tree removal outside of the limits of excavation and embankment areas as specified in Section 810. Removal of objectionable material, rubbish, and junk within the project limits. Removal of buildings and structures, fences, walls, guide rail posts, guide rails, signs, direction markers, and other obstructions interfering with the work that are not included in other contract items. Disposal of removed material. Salvaging, temporarily storing, and delivering of material. Obtaining of waste areas for disposal of material as specified in Section 105.14. Stockpiling of topsoil and topsoil mixture as specified in Section 801. Chipping and stockpiling wood waste material, if specified in the Special Provisions The eTicketing system must be fully integrated with the load read-out system at the plant and capable of transmitting ticket information to the PennDOT eTicketing system. The system software and hardware must prevent alteration of the data inputs from the asphalt mixing plant's recording truck scale or recording weigh hopper, or the asphalt mixing plant's recording aggregate, asphalt, and other material scales. This work is either construction of the culvert as designed or designing and constructing an equivalent culvert of an alternate design in place of the "as-designed" culvert. - This work is the installation of "Warning - Do Not Spray or Mow" signs mounted on wooden stakes at the top of the bank of the relocated portion of the UNT to Opossum Creek. To discharge dredged and/or fill material into waters and/or wetlands associated with the replacement of State Route (SR) 0034 slab bridge with a 11' x 6' precast reinforced box culvert. Associated work includes the reconstruction of the approach roadway and shoulder, pavement overlay, stream realignment, guide rail upgrades, and scour protection. The project will permanently impact 22-linear-feet (132- square-feet) of stream (Stream Channel 1) and 33-square-feet of emergent wetlands (Wetland D); permanently relocate 342-linear-feet (2,736-square-feet) of stream (Stream Channel 2); temporarily impact 459-linear-feet of stream (462 ft 2 of Stream Channel 1 & 3,056 ft 2 of Stream Channel 2) and 10-square-feet of emergent wetlands (Wetland D).
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 28, 2025
PA-34, Menallen Township, PA
Related To This Project
Menallen Township, PA
Bid Date: Nov 08 2021
Menallen Township, PA
Bid Date: Sep 12 2024
Menallen Township, PA
Bid Date: Sep 11 2025
Menallen Township, PA
Bid Date: May 04 2022
Lancaster, PA
--
Manheim Township, PA
--
Reading, PA
Bid Date: Mar 01 2023
Summit Township, PA
--
State College, PA
--
Sharon, PA
Bid Date: Jan 26 2023
Jefferson, PA
Bid Date: Jan 26 2023
Selinsgrove, PA
Bid Date: Aug 19 2022
Yoe, PA
Bid Date: Feb 03 2023
East Greenville, PA
Bid Date: Dec 21 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
