BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2021 at 7:00 PM

Updated November 15, 2023

Demolition, site work, renovation and addition to a mixed-use development in Philadelphia, Pennsylvania. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Custom BT General - OPI Construction - $12772670 Mechanical - Edward J. Meloney - $4568000 Plumbing - Dolan Mechanical - $2302000 Electrical - Lex Electric Company, Inc. - $3356000 Specification #'s: B-070 C (R) of 2019/20 (G), B-071 C (R) of 2019/20 (M), B-072 C (R) of 2019/20 (P), B-073 C (R) of 2019/20 (E) The School District, the PM/CM or the Architect/Engineer shall have authority to order minor changes in the Work, not involving an adjustment in the Contract Sum, or an extension of the Contract Time, and not inconsistent with the intent of the Contract Documents. Such changes may be made through the RFI process or by mark-ups, comments or notations on shop drawings or submittals. Such changes shall be effected by written order, and shall be binding on the School District and the Contractor. The Contractor shall carry out such written orders promptly. The Work comprises the completed construction required by the Contract Documents and includes all labor, materials, consumables, small tools, and equipment, and contractual requirements as indicated in the Contract Documents, necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction. Under the multi-prime bidding and contracts requirements of the Public School Code, 24 P.S. 7-751(a.2), the School District will solicit bids for multiple separate construction contracts and enter into multiple separate construction contracts (hereinafter referred to as "separate Prime Contracts" or "multiple Prime Contracts" or "separate contracts") with multiple separate construction contractors (hereinafter referred to as "separate Prime Contractors" or "multiple Prime Contractors" or "separate Contractors") on the Project for the performance of all construction work, including general construction work (which shall include civil, structural, roofing, architectural, utilities, paving and landscaping), heating, ventilating and air conditioning (HVAC) work, plumbing work, or electrical work, on the Project. The Project is the total design and construction of which the Work performed under the Contract Documents may be the whole or a part and which includes construction by the Owner and by multiple separate Prime Contractors (Contractor and such multiple separate Prime Contractors hereinafter referred to as "Contractor").

Bid Results

Educational

$22,998,670.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
936
Active Projects
475
Bidding Soon
6,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

March 1, 2022

Project location map

7809 Castor Ave, Philadelphia, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.