BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Ames, Iowa. Working plans call for the renovation of a educational facility.

The project consists of, but is not limited to, modifications to the water service entrance; new sprinkler piping and valves; and updating the fire detection and alarm system. Questions regarding the scope of work should be directed to Brian Grove of Resource Consulting Engineers, LLC, Phone: (515) 291-9636, E-mail: brian.grove@resource.com. Project Information: Substantial Completion: 180 Days (Approximately November 22, 2022) Final Completion: 240 Days (Approximately January 21, 2023) Bids will be received for a single General Construction Contract. Bid security shall be agreed upon as the measure of liquidated damages which the Owner will sustain by failure, neglect or refusal of bidder to deliver a signed contract stipulating performance of the Work in unqualified compliance with Contract Documents. Successful bidder will be required to furnish a Contract Performance and Payment Bond in the amount of 100% of the contract sum within ten (10) days after receipt of Notice of Award. No bid may be withdrawn for a period of forty-five (45) calendar days after the date of opening. The Board of Regents, State of Iowa seeks to provide opportunities for Targeted Small Businesses in accordance with the provisions of Chapter 73 of the Code of Iowa. This project has a participation goal of 10% for certified Targeted Small Businesses as specified in the Project Requirements. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the state of Iowa. The Board of Regents, State of Iowa, reserves the right to reject any and all bids, to waive irregularities and to accept that bid which is deemed in the best interest of the Owner. Installation of new automatic wet-pipe sprinkler system to serve indicated portions of building, along with manual wet-pipe standpipe connections at indicated locations. New water service, fire alarm system modifications to monitor sprinkler system, and other associated work necessary to support installation of sprinkler system shall also be provided As of September 4, 2023, no rebid info available from isu

Final Planning

Educational

$984,500.00

Public - State/Provincial

Renovation

11

14

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
43
Bidding Soon
472
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

September 25, 2023

img_map_placeholder

700 Wallace Road, Ames, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.