BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Lockport, New York. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a educational facility.

The work will take place at Lockport CSD: North Park Junior High School- 160 Passaic Avenue, Lockport, NY 14094 and Emmet Belknap Intermediate School- 491 High Street, Lockport, NY 14094. Storage Building at NP : SED Control Number: 40-04-00-01-2-029-001 Storage Building at EB : SED Control Number: 40-04-00-01-2-030-001 Post Bid Conference October 2, 2019 Award of Contracts October 9, 2019 Notice to proceed October 10, 2019 Construction start Upon receipt of Insurance Certificate and signed contract Substantial Completion November 30, 2019 Liquidated Damages: The Owner and the Contractor recognize that time is of the essence and that the Owner will suffer financial loss if the work is not completed within the specified time. Accordingly, the Owner and Contractor agree that as liquidated damages for a delay (but not as a penalty), the Contractor shall pay the Owner One Thousand Dollars ($1,000) per day that expires after the time specified for completion until the work is actually complete. On-Site Work Hours: Work shall be generally performed inside the existing building during normal business working hours of 7 a.m. to 3:30 p.m., Monday through Friday. Second shift work from 3:30 p.m. to 10:30 p.m. and Saturdays 7 a.m. to 3:30 p.m. will be allowed when requested and approved by the Clerk of the Works. B. All work performed during the normal school year will be on Second shift unless approved by the Clerk of the Work. This may be allowed, for contract work, to progress during the regular shift if it is in non- student occupied space and approved by the Clerk of the Works. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. Payment procedures and additional requirements are defined in the contract documents. Bidders are required to furnish a Proposal Guaranty of 10 percent of the amount of the Proposal, either by bank cashiers check, payable to the owner, or Bid Bond, conforming to law, and satisfactory to Owner. Performance, Labor and Material Payment Bonds are required.

Award

Warehouse / Distribution

$158,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
97
Bidding Soon
2,490
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2019

October 10, 2019

img_map_placeholder

Multiple Locations, Lockport, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.