Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Fort Wayne, Indiana. Completed plans call for the renovation of a detention facility.
Each bid proposal shall include all labor, material, and services necessary to complete this project in strict accordance with the plans and specifications as prepared by Martin Riley Architects Engineers and on file in the Allen County Department of Public Purchase. Contractors and suppliers must conform to IC 5-16-13. Be sure to familiarize yourself with these changes before bidding on public works projects. Bids shall be properly and completely executed in accordance with the Instructions to Bidders and shall be submitted on the Bid 96 Form included in the Project Manual. The bids shall be lump sum and shall be received for a prime contract. Contractor is to include an allowance of $5,000.00 in the bid. Allowance is to be used for changes in scope resulting from unforeseen conditions at the site. Allowance can only be used with written approval by Architect and Owner. Any unused allowance must be returned to the Owner. The bid bond must be present and attached to the original bid. Bid envelope (minimum size 9" x 12") must be sealed and include company name and address, project name, bid reference number, and date and time of bid opening. Each bidder is required to include one (1) original and two (2) copies of their bid. The following documents must be submitted with the bid: Completed State Bid Form 96 (revised 2013) including the NonCollusion Affidavit Statement of Company Equal Employment Opportunity and NonDiscrimination Policy Indiana Legal Employment Declaration (E-Verify) Written plan for employee drug testing program W-9 (In the absence of a Federal Identification Number, a Social Security Number must be provided.) Required documents must be included with each submittal. Contractors and suppliers shall conform to IC 5-16-13. The successful bidder(s) will be required to furnish insurance covering Workmens Compensation, Public Liability and Property Damage and any other which may be required, before the contract can be signed and issued. Bids shall not be modified, withdrawn or canceled, without the Owners written consent, for a period of Sixty (60) calendar days commencing from the day bids are received. An out of state contractor shall have Indiana State Gross Income Tax withheld by Allen County, unless he can show proof that he is registered with the Indiana Secretary of State to conduct business in the State of Indiana. No fee will be charged for permits required and issued by the Allen County Building Department for work done on any Board of Commissioners of the County of Allen, Indiana owned property. The Board of Commissioners of the County of Allen, Indiana reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Notice to Bidders and reserves the right to waive irregularities. Documents shall be available for inspection at: Martin Riley Architects Engineers, 221 W. Baker Street, Fort Wayne, IN 46802 Or Allen County Department of Public Purchase, 200 East Berry Street, Suite 495, Fort Wayne, IN 46802
Award
Jails / Prisons
$192,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 26, 2019
October 1, 2019
101 E Superior St, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Jun 04 2019
Fort Wayne, IN
Bid Date: Jun 05 2019
Fort Wayne, IN
Bid Date: Aug 21 2019
Fort Wayne, IN
Bid Date: May 23 2019
Fort Wayne, IN
Bid Date: Jun 25 2019
Fort Wayne, IN
Bid Date: Jul 16 2019
Fort Wayne, IN
Bid Date: Aug 06 2019
Fort Wayne, IN
Bid Date: Jul 21 2020
Fort Wayne, IN
Bid Date: Mar 17 2020
Fort Wayne, IN
Bid Date: Mar 10 2020
Fort Wayne, IN
Bid Date: Jul 21 2020
Fort Wayne, IN
Bid Date: Mar 24 2020
Fort Wayne, IN
Bid Date: Sep 15 2020
Fort Wayne, IN
Bid Date: Oct 20 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.