BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work, paving and renovation of a civil project in Hilton Head Island, South Carolina. Design plans call for site work for a road / highway; for paving for a road / highway; for the renovation of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

The purpose of this project is to address structural deficiencies at the existing eastbound MacKay Creek bridge, to increase capacity, and reduce congestion along US 278 from Moss Creek Drive to Spanish Wells Road. The 2,230 ft Mackay Creek east-bound lane is structurally deficient and will be replaced. The remaining bridges (2,230 ft Mackay Creek west-bound lane and 2,823 ft Skull Creek bridges) will be replaced as well. Two causeways within the project limits may need to be widened and may become part of the structures scope of work. The team is tasked with studying the existing bridges to determine the viability of widening and/or retrofitting the existing structures to perform adequately for anticipated seismic levels for the area. The project will include: - A single, new bridge with full shoulders on both sides to improve emergency response and be future ready. - A ramp and local road to improve access to Pinckney Island and the C.C. Haigh Jr. Boat Landing, addressing long-standing community concerns. - The ‘Hog Island Connector,’ a local access road and bridge maintaining access to Hog Island and Mariner’s Cove As of November 21, 2025, the full US 278 Corridor Improvements Project is still a priority, but it’s currently on hold because of a funding gap. The US 278 Eastbound Bridge Replacement is moving forward now as a separate project—and it is being designed to fit seamlessly into future corridor upgrades should funding become available. Design team has been identified. Construction expected in early 2028. Completion anticipated by December 2030.

Design

Bridges / Tunnels

$311,600,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
37
Bidding Soon
795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

US-278, Hilton Head Island, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.