Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Site work, paving and renovation of a civil project in Hilton Head Island, South Carolina. Design plans call for site work for a road / highway; for paving for a road / highway; for the renovation of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.
The purpose of this project is to address structural deficiencies at the existing eastbound MacKay Creek bridge, to increase capacity, and reduce congestion along US 278 from Moss Creek Drive to Spanish Wells Road. The 2,230 ft Mackay Creek east-bound lane is structurally deficient and will be replaced. The remaining bridges (2,230 ft Mackay Creek west-bound lane and 2,823 ft Skull Creek bridges) will be replaced as well. Two causeways within the project limits may need to be widened and may become part of the structures scope of work. The team is tasked with studying the existing bridges to determine the viability of widening and/or retrofitting the existing structures to perform adequately for anticipated seismic levels for the area. The project will include: - A single, new bridge with full shoulders on both sides to improve emergency response and be future ready. - A ramp and local road to improve access to Pinckney Island and the C.C. Haigh Jr. Boat Landing, addressing long-standing community concerns. - The ‘Hog Island Connector,’ a local access road and bridge maintaining access to Hog Island and Mariner’s Cove As of November 21, 2025, the full US 278 Corridor Improvements Project is still a priority, but it’s currently on hold because of a funding gap. The US 278 Eastbound Bridge Replacement is moving forward now as a separate project—and it is being designed to fit seamlessly into future corridor upgrades should funding become available. Design team has been identified. Construction expected in early 2028. Completion anticipated by December 2030.
Design
Bridges / Tunnels
$311,600,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
US-278, Hilton Head Island, SC
Related To This Project
Hilton Head Island, SC
Bid Date: Aug 26 2024
Hilton Head Island, SC
Bid Date: Sep 09 2024
Hilton Head Island, SC
Bid Date: Sep 30 2024
Hilton Head Island, SC
Bid Date: Oct 16 2024
Hilton Head Island, SC
Bid Date: Oct 04 2024
Hilton Head Island, SC
Bid Date: Oct 03 2024
Hilton Head Island, SC
Bid Date: Oct 07 2024
Hilton Head Island, SC
Bid Date: Oct 28 2024
Hilton Head Island, SC
Bid Date: Jan 26 2021
Hilton Head Island, SC
Bid Date: May 25 2021
Hilton Head Island, SC
Bid Date: May 04 2021
Hilton Head Island, SC
Bid Date: Jul 24 2024
Hilton Head Island, SC
--
Hilton Head Island, SC
Bid Date: Aug 15 2024
Hilton Head Island, SC
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
