BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2023 at 8:00 PM

Updated January 18, 2024

Site work and new construction of a transportation facility in Kahului, Hawaii. Completed plans call for the construction of a 27,390-square-foot, two-story above grade transportation facility; and for site work for a transportation facility.

The scope of work consists of construction of a new Transportation Security Administration (TSA) Security Screening Checkpoint Building and air-conditioning of existing TSA Checkpoint at Kahului Airport. Estimated construction cost is between $50,000,000 and $60,000,000. Minimum prevailing wages (basic hourly rate plus fringe benefits), as determined by the Director of Labor and Industrial Relations and published in wage rate schedules, shall be paid to the various classes of laborers and mechanics working on the job site. [104-2(a), (b), Hawaii Revised Statutes (HRS)] If the Director of Labor determines that prevailing wages have increased during the performance of a public works contract, the rate of pay of laborers and mechanics shall be raised accordingly. [104-2(a) and (b), HRS 12-22-3(d) Hawaii Administrative Rules (HAR)]. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. A valid surety bid bond, underwritten by a company licensed to issue bonds in the State of Hawaii; or (3) A certificate of deposit; credit union share certificate; or cashier's, treasurers, tellers, or official check drawn by or a certified check accepted by a bank, savings institution, or credit union insured by the Federal Deposit Insurance Corporation (FDIC) or the National Credit Union Administration (NCUA) and payable at sight or unconditionally assigned to the Department. Estimated construction cost is between $50,000,000 and $60,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/08/2023 at 2:00 PM HT

Bid Results

Transportation Terminals

$42,857,968.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

November 14, 2023

Project location map

1 Keolani Pl, Kahului, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.