BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2019 at 7:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Brunswick, Georgia. Completed plans call for site work for a water / sewer project.

The Brunswick-Glynn County Joint Water and Sewer Commission (JWSC) is in the process of evaluating downstream conveyance systems improvements required to address various I/I related issues throughout the JWSC service area. This project contains rehabilitation work elements to reduce I/I flows via CIPP lining. The preliminary report identifies two (2) separate areas as top candidates for CIPP rehabilitation. Located in the Brunswick district, the Altama Avenue corridor is a main thoroughfare connecting downtown Brunswick to the Northern Mainland district. It experiences significant traffic due to its proximity to educational and healthcare institutions along the route. Located in the SSI district, the Sea Palms neighborhood is a major residential development located on either side of Frederica Road (the only North/South route for the mid and north island areas) just a few miles north of the Sea Island Road intersection. See Exhibit A for maps of each area where the work is to be performed. JWSC requests qualified individuals and firms with experience in grout/CIPP and point repairs. Firms should have the qualification to provide the requested services that will include all labor, materials and equipment required to complete the required repairs, documentation, acceptance tests, visual inspection or vacuum test and warranty in accordance with established standards using approved products as detailed in the Technical Specifications included as Exhibit B. Pricing should be all inclusive with coordination and responsibility of all activities related to permitting, traffic control, flagging bypass pumping, jetter truck, OSHA confined space entry compliance, and debris removal included. The timeframe to complete this scope of work (including final reports) is estimated not to exceed one hundred and fifty (150) calendar days. Bidders are advised to consider this aspect thoroughly as they plan and evaluate the multiple elements that will be involved to execute this project within the desired timeframe. 11/07/2019 Anticipated Award Date 11/07 - 12/15/2019 Contract Execution Period and Pre-Construction Meeting/Notice to Proceed Week of 01/06/2020 Commencement of Work May 2020 Completion of Work Deadline for questions is Friday, October 25th, no later than 5:00 p.m. EST. Questions must be directed in writing (via e-mail) to the Purchasing Director, Pamela Drury-Crosby, email- pcrosby@bgjwsc.org

Award

Water / Sewer

$599,937.00

Public - County

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
42
Bidding Soon
921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2019

January 6, 2020

Project location map

Altama Ave, Brunswick, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.