Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Northport, New York. Completed plans call for the renovation of a 1,600-square-foot retail development.
Award Details Contract Award Date: Dec 15, 2021 Contract Award Number: 36C24222C0016 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 117535800 Contractor Awarded Unique Entity ID (SAM): EDHFNURX9MD4 Contractor Awarded Name: AFCI-CCI JV ONE LLC Contractor Awarded Address: ELK GROVE VILLAGE, IL 60007 Base and All Options Value (Total Contract Value): $3088000.00000000 The cost estimate range for this project is between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Project will renovate and expand the Pharmacy Spaces on the Third Floor (including Part of Unit 31) in Bldg. No. 200 at the Northport VA Medical Center, 79 Middleville Road, Northport, NY 11768. The Contractor shall furnish labor and materials and perform work for expansion and renovation of existing space located at the first floor of the main hospital building as required by the drawings and specifications. The contractor is to provide CETA certification for the spaces and equipment as stated on contract documents. Work includes abatement, demolition, general construction, alterations, equipment, structural, mechanical, plumbing, fire protection, electrical and fire alarm work; phased alterations to existing Pharmacy Service spaces (one located across from the main elevator Lobby and the other in Unit 31). There is also ancillary work in the Basement, light work on an existing shaft going from the basement to the Penthouse and work in the Penthouse as well as on the roof. Electrical Work includes all labor, material, equipment and supervision to perform the required electrical and fire alarm construction work on this project including phased removals of existing equipment and devices as indicated on the drawings; phased installation of new interior and site power and lighting; emergency generator, distribution boards and panels; fire alarm system, security system, nurse call system; new work at existing basement switchgear and generator room; electrical work required for new elevator, mechanical equipment and devices. Mechanical Work includes all labor, material, equipment, phased removals of existing mechanical, plumbing and fire protection systems, piping, plumbing fixtures and devices on the third floor, as indicated on the contract drawings; phased installation of new air handling units associated ductwork, terminal units, reheat coils and controls; plumbing work as indicated on the drawings. All items as required by the contract drawings and specifications. This contract does not involve VA sensitive information and contractor personnel do not require access to VA systems. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of VA The contract duration is 455 calendar days from receipt of Notice to Proceed.
Award
Retail
$3,088,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2021
November 1, 2021
79 Middleville Rd, Northport, NY
Related To This Project
Northport, NY
--
Northport, NY
Bid Date: Jun 14 2022
Northport, NY
Bid Date: Mar 11 2022
Northport, NY
Bid Date: Jul 12 2021
Northport, NY
Bid Date: Apr 09 2020
Northport, NY
Bid Date: Sep 15 2022
Northport, NY
Bid Date: Sep 20 2022
Northport, NY
--
Northport, NY
Bid Date: Aug 09 2022
Northport, NY
--
Northport, NY
Bid Date: May 26 2022
Northport, NY
--
Northport, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.