BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Boynton Beach, Florida. Conceptual plans call for the addition of a educational facility.

Design services required for the completion of Core Expansion projects at Citrus Cove Elementary School, Del Prado Elementary School, and Seminole Trails Elementary School to accommodate the current student capacity of each school. Design will consist of: building addition to increase dining and kitchen areas; remodel core related spaces including clinic, administration, and exterior corridor access; and associated parking and site modifications as required. Basic Services shall include development of a conceptual design, preliminary site plan, development of a Facilities List, and outreach and engagement as may be required. The schedule for design deliverable's will be phased based upon a phased construction schedule as determined by the Owner. Construction phasing will be coordinated with the separate Facility renewal projects at each school that will be ongoing through 2021. The Architect shall provide all professional services necessary to deliver Permitted Design Documents within the established Construction Budget and in accordance with the established Design Schedule. Design Schedule Citrus Cove ES: Commencement of Design not later than 2/3/2020 Completion of 100% Construction Documents not later than 7/8/2020 Permitted Construction Documents not later than 8/11/2020 Design Schedule Del Prado ES: Commencement of Design not later than 5/25/2020 Completion of 100% Construction Documents not later than 11/6/2020 Permitted Construction Documents not later than 12/18/2020 Design Schedule Seminole Trails ES: Commencement of Design not later than 8/24/2020 Completion of 100% Construction Documents not later than 2/5/2021 Permitted Construction Documents not later than 3/11/2021 All questions regarding this solicitation must be submitted electronically. For General Inquiries Contact: Barbara Myers at 561-882-1934 or by email at barbara.j.myers@palmbeachschools.org. Only questions received by the time and date specified will be answered by Addendum and posted electronically. Citrus Cove Elementary School: Construction: $2,690,000 Design: $260,000 Del Prado Elementary School : Construction: $2,690,000 Design: $260,000 Seminole Trails Elementary School : Construction: $2,690,000 Design: $260,000 The method of contractor selection has not been determined at this time.

Conceptual

Educational

$780,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
53
Bidding Soon
1,167
All Active Projects
532
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2020

img_map_placeholder

Multiple Locations, Boynton Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.