BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Missoula, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work generally includes roadway excavation and embankment, new roadway construction, trail construction, chip seal, signing, striping, landscape restoration, and related work in accordance with the Plans and Specifications. All questions about the meaning or intent of the Contract Documents are to be submitted in writing to the Engineer, Mark Bancale, P.E. of WGM Group (mbancale@wgmgroup.com). Questions submitted after 12:00 p.m. (noon), local time, on April 5, 2022, are not guaranteed to be answered before the bid due date and time. The project is funded by the City of Missoula and is subject to all applicable state and local regulations as indicated within the specifications. All work must be substantially complete within 45 calendar days after the commencement date stated in the notice to proceed. Notice to proceed will be flexible with completion no later than October 15, 2022. The site of the work is located generally at the intersection of Mullan Road and Chuck Wagon Drive in Missoula, Montana. The work generally includes roadway excavation and embankment, new roadway construction, trail construction, chip seal, signing, striping, landscape restoration, and related work in accordance with the Plans and Specifications. The City reviewed the general contract requirements related to total contract time (45 days), liquidated damages ($750/day) and applicable wage rates. The Contract Docs are available on Quest CDN

Post-Bid

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

24

11

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
56
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

May 9, 2022

img_map_placeholder

Mullan Rd, Missoula, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.