BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2019 at 7:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Ayer, Massachusetts. Completed plans call for site work for a water / sewer project.

Work to be performed under this Contract includes, but is not limited to, providing all materials, equipment, labor and supervision for pipeline cleaning, pipeline closed circuit television (TV) inspection, sewer pipeline rehabilitation, manhole rehabilitation, and associated work, complete with all other appurtenances and related work required to complete the project. Sewer pipeline rehabilitation includes in-situ (trenchless) repairs, which includes cured-in-place pipe lining (CIPPL) and testing and sealing service connections. Beginning October 9, 2019,

Award

Water / Sewer

$174,700.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
249
Bidding Soon
4,610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2019

November 22, 2019

Project location map

Multiple Locations, Ayer, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.