BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Milwaukee, Wisconsin. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://county.milwaukee.gov/files/county/administrative-services/PSB/BudgetsCopy-1/2021-Budget/2021-Adopted-Budget/2021AdoptedCapital.pdf The scope of work includes construction phase for E. North Ave Bridge B-40-0502 over Oak Leaf Bike Trail in the Local Bridge Program (LBP). The overall project scope of work includes the rehabilitation of bridge B-40-0502, E. North Ave Bridge which is between N. Bartlett Ave and N. Oakland Ave in the City of Milwaukee. It is a 95.6-foot single span prestressed concrete girder deck bridge built in 1975. The bridge rehabilitation will address concrete spalling, rusting reinforcement, cracking, masonry pop-outs, grout line deterioration, stream erosion of bank protection, channel wall deterioration and other structural deficiencies. The State funding from the Wisconsin Department of Transportation (WISDOT) under the LBP was approved for a total estimated cost of $1,254,105 where it would provide 80% for the State share $1,003,284 and 20% $250,821 Milwaukee County share. There is an additional $23,585 of County funds for ineligible items that are not covered by WISDOT. Estimate Anticipated Funding $1,000,000 - $1,999,999 As of December 22, 2021, this project is included County of Milwaukee FY 2021-2025 CIP. Information regarding design firm and general contractor selection has not been disclosed. A firm construction timeline has not been released. Anticipated letting date is November 09, 2021. *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
65
Bidding Soon
1,049
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

img_map_placeholder

E North Ave, Milwaukee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.