BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and theater / auditorium.

Pedestrian Pavement Replacement Work consists of reconstructing the east/main entrance to the Marcus Center and along the Milwaukee River/west side of the Peck Pavilion. Safety bollard, cable barrier, and decorative colored concrete will be utilized as indicated in the project Bid documents. Project Completion: Marcus Center entry / drop-off area shall be substantially complete by October 8th, 2021 (Friday). Remainder of the project scope shall be substantially completed by November 12th, 2021 (Friday) Project Funded: Local Targeted Business Enterprise (Tbe) Participation Goal for This Project Is 25 Percent. To Be Considered for This Project All Required Tbe-14 Forms Shall Be Completed and Signed by Prime and Submitted as Indicated in Invitation to Bid. Contractors shall employ a minimum of 50% of the Contract labor force with employees that reside in Milwaukee County. Bidders shall submit the completed Subcontractor-Supplier Information Entry with the Bid. Failure to submit this information with Bid may result in rejection of the Bid as non-responsive. A 10 percent bid bond or certified check is required with bid. The low responsive, responsible bidder will be recommended for contract award. Owner reserves right to reject bid, to waive informalities in bid or to accept bid which will be in best interest of Owner. Bids shall remain open to acceptance for a period of 60 days after bid due date.

Award

Sidewalks / Parking Lot

$402,000.00

Public - County

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
194
Bidding Soon
1,939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2021

August 16, 2021

Project location map

929 N Water St, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.