BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2020 at 7:00 PM

Updated September 14, 2023

Remodeling of a mixed-use development in Delray Beach, Florida. Completed plans call for the remodel of a educational facility; and service station / car wash facility.

Construction Management services required for the completion of Delray Full Service Center construction project consisting of demolition of existing buildings 3 through 10, 13 & 14, remodeling the Gymnasium to an Auditorium, new construction of a +/-18,000 GSF, 2 story Adult Education instructional/classroom building and additional parking and site modifications. The construction shall not exceed the established cost/student station established by the Florida Department of Education based on scheduled occupancy of August 2021. The CONSTRUCTION MANAGER shall provide all Preconstruction Phase Services necessary to establish a GMP as well as all Construction Phase Services following Award of the GMP for the school identified in the Project Notification. The CONSTRUCTION MANAGER will be required to complete portions of the construction on an occupied campus as directed by the OWNER. Construction shall incorporate all of the requirements set forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in Department of Education's Chapter 6A- 2, SREF and FAC. Construction Schedule: Construction for the School Will Be Phased. Phase 1 Site Construction: 100% Construction Documents: May 8, 2020 Board Award Gmp: July 2020 Phase 2 Construction: 100% Construction Documents: August 15, 2020 Board Award Gmp: October 2020 All Work for the School Must Be Substantially and Finally Completed on the Following Dates: Substantial Completion - Classroom Building: July 21, 2021 Substantial Completion - Remainder of Work: December 21, 2021 Final Completion: February 4, 2022 Budget Established for Construction: $6,900,000 Q & A deadline: Dec 09, 2019 2:00:00 PM EST

Award

Service Station / Car Wash

$6,900,000.00

Public - County

Remodeling

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
9
Bidding Soon
1,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2019

April 16, 2020

Project location map

301 SW 14th Ave, Delray Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.