Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Dallas, Georgia. Completed plans call for the construction of a 64,500-square-foot educational facility; and for site work for a educational facility.
As of September 14, 2022, this project is under construction and is anticipated to be completed in 13 to 15 months. The owner has selected a Construction Manager. The new facility would allow Chattahoochee Technical College to train students in Aviation Maintenance Training Technology programs to diagnose problems and repair aircraft power plants and airframes. Aviation Maintenance Training Technology programs to be provided by Chattahoochee Tech would include certification programs approved by the Federal Aviation Administration (FAA), diplomas, and associate degree programs. The new aviation academy would operate at the Silver Comet Field of the Paulding County Northwest Atlanta Airport in Dallas, Georgia.The Paulding Northwest Atlanta Airport is the first jetcapable airport to be built in Georgia in over thirty years. The airport was designed to accommodate the anticipated growth in both private and corporate aircraft operations throughout the next fifty years. It is envisioned the new aviation academy will encompass approximately 64,500 square feet. While not limited to, the facility would include program space for the following: o Administrative Space (admin support, guest reception/waiting, restrooms, office space, break room/lounge, conference room, file/storage, testing lab, FAA file room, huddle room, wellness room) o Student Areas (student break area/lounge, tool room that includes a minimum of 100 lockers and shelving for small tools) o Classrooms (lecture only 25 students each, computer labs for instruction and testing as required) o Hanger/Labs (hanger, NiCad battery room, lead acid battery room, paint booth, technical library, parts and tools crib, ground support/equipment storage, composites and bonding., air frame lab, power plant lab, chemical storage, avionics lab, structural lab, upholstery & trim lab) o Building Services (mechanical room, electric room, IT/MDF room, facilities office, storage, fire pump room) o Exterior (240 parking spaces, loading area, plane/parts storage, pad mounted equipment) The preliminary Stated Cost Limitation (SCL) or construction cost of the Project is estimated at $24,000,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. Deadline for submission of written questions and requests for clarification 8/14/2021 2:00 PM Questions from Construction Professionals about any aspect of the RFP, or the project, shall be submitted in writing (e-mail is preferable) to: Jeff Lacks, Director Procurement e-mail: jeff.lacks@gsfic.ga.gov Deadline for finalist submission of written questions and requests for clarification 9/28/2021 2:00 PM Submission of Fee Proposals 10/6/2021 2:00 PM
Under Construction
Educational
$24,000,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2021
November 3, 2021
400 Nathan Dean Blvd, Dallas, GA
Related To This Project
Dallas, GA
Bid Date: Oct 09 2023
Dallas, GA
Bid Date: Jan 08 2024
Dallas, GA
Bid Date: Nov 17 2023
Dallas, GA
Bid Date: Nov 06 2023
Dallas, GA
Bid Date: Nov 17 2023
Dallas, GA
Bid Date: Nov 14 2023
Dallas, GA
Bid Date: Dec 01 2023
Dallas, GA
Bid Date: Apr 08 2022
Dallas, GA
Bid Date: Mar 11 2022
Dallas, GA
Bid Date: Mar 11 2022
Dallas, GA
Bid Date: Mar 31 2022
Dallas, GA
Bid Date: Mar 23 2018
Dallas, GA
Bid Date: Jan 24 2022
Dallas, GA
Bid Date: Feb 27 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.