Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a bridge / tunnel in Minneapolis, Minnesota. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.
Construction services for temporary relocation of steam and condensate lines, followed by permanent construction of new steam and condensate lines, with catwalk, for Bridge 9 as per ` drawings and specifications. The project consists of relocation of existing steam and condensate lines to a temporary structure plus removal of the existing steam lines and catwalk in April 2020 and final removal of temporary steam and condensate in October 2020. In addition, the cost for permanent install of the new steam, condensate, and catwalk in October 2020 is being defined and listed with an independent line item value of $550,000 and that cost value should be included in the contractor proposal and schedule of values. Updated construction documents will be released by addendum approximately February 28, 2020. Project documents are confidential and are password protected. Deadline for RFP Questions Tuesday, March 10, 2020 at Noon If you are a General or Mechanical contractor, please email Chip Foster at foste048@umn.edu on your company letterhead requesting the password. Barr Engineering is the Architect/Engineer of Record for the Project. The total construction budget for this Project is $1,300,000 (current dollars, no escalation).
Award
Bridges / Tunnels
$1,300,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 17, 2020
March 31, 2020
November 6, 2020
West River Rd N, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: May 17 2022
Minneapolis, MN
Bid Date: May 17 2022
Minneapolis, MN
Bid Date: May 16 2022
Minneapolis, MN
Bid Date: Mar 29 2022
Minneapolis, MN
Bid Date: Mar 17 2022
Minneapolis, MN
Bid Date: Mar 23 2022
Minneapolis, MN
Bid Date: May 18 2022
Minneapolis, MN
Bid Date: May 18 2022
Minneapolis, MN
Bid Date: May 27 2021
Minneapolis, MN
Bid Date: Dec 17 2021
Minneapolis, MN
Bid Date: Feb 08 2022
Minneapolis, MN
Bid Date: Apr 27 2022
Minneapolis, MN
Bid Date: Mar 24 2022
Minneapolis, MN
Bid Date: Mar 24 2022
Minneapolis, MN
Bid Date: Apr 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--