BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2021 at 7:00 PM

Updated November 15, 2023

Site work, paving and renovation of a mixed-use development in Carson City, Nevada. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Carson City is accepting sealed bids for all labor, materials, tools and equipment necessary for the CDBG - Ross Gold Park ADA Restroom Renovation - a Federally Funded Project. The scope of work to include demolition, grading, sleeves, aggregate base, 6" concrete, wood framing, restroom remodeling to ADA compliance, masonry patch work, painting, epoxy floors, plumbing, electrical, signs, accessories, drinking fountain, sprinkler modifications and sod replacement. Sealed bids must be submitted in accordance with the bid documents, drawings and plans, specifications and special conditions related hereto. All contractors must comply with NRS 338.01165 for this project, unless a modification, waiver, or exemption applies. The CDBG Ross Gold Park ADA Restroom Renovation Project consists of removal and replacement of all existing toilets, stall partitions, exterior doors and lavatories with ADA compliant toilets, accessories, lavatories, hand dryers, exterior doors and a drinking fountain as shown on the plans. The project also includes radiant heating, interior wall and flooring repairs, interior and exterior painting, plumbing and electrical modifications, new exterior concrete landing and approach sidewalk and all common phases customarily associated with this type of project. The Contractor will be responsible for site safety and protection of public from hazards at all times during construction. Existing infrastructure (signage and striping, driveways, curb and gutter, sidewalk, utilities) will be returned to current or better condition. JOB NO.: 20049 PROJECT# G500019011 The successful Bidder, upon becoming the Contractor after having entered into a Contract with the City, shall commence the Work to be performed under the Contract on the date set by the City, continuing the Work in accordance with the approved schedule and shall complete the entire Work by and within 40 working days.

Award

Playgrounds / Parks / Athletic Fields

$100,440.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
32
Bidding Soon
371
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2021

March 11, 2021

Project location map

280 E Appion Way, Carson City, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.