BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2024 at 8:00 PM

Updated August 29, 2024

New construction of a bridge / tunnel in Richmond Hill, Ontario. Conceptual plans call for the construction of a bridge / tunnel.

Railway Grade Separation to Elgin Mills Road (YR49) from Yonge South (YR1) to Bayview Avenue (YR34). TIMELINE: HDR Corporation has been contracted to complete the Class C Environmental Assessment Study. The study is expected to continue through to the end of 2024. Preferred solution is a new structure. Open house #2 occurred March 11-April 1, 2024 at which time information about the study process, findings to date, design options and the recommended design to separate the road and train tracks was made available for viewing and comment. Construction is not expected before 2026. Updates may be available spring 2025.

Conceptual

Bridges / Tunnels

$74,300,000.00

Public - County

New Construction

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
138
Bidding Soon
4,858
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

Project location map

Elgin Mills Rd W, Richmond Hill, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.