Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Sunrise, Florida. Design plans call for the renovation of a water / sewer project.
As of April 24, 2024, an engineer has been selected and this project is in the design phase. It is anticipated a general contractor will be awarded by end of 2024, with construction starting mid-2025. Design firm information has not been determined. The project is include in the city's 2024-2028 Capital Improvement Program (CIP). The waste sludge at Sawgrass WWTP is thickened at the Dissolved Air Flotation (DAF) process to approximately 2 - 3 % solids and then transferred to the sludge holding tanks prior to high solids centrifuge dewatering. The centrifuge process requires the sludge to be at least 2% solids but not higher than 5% solids for proper functioning of centrifuges. The DAF introduces pressurized air and a polymer, causing the solids to rise and float to the surface. Solids are scraped off the top and pumped into holding tanks and wastewater is recirculated back to treatment. The DAF system was built in two phases: The first phase was built in 1987 with the Train A construction and the second phase was built in the 1996 plant expansion project. The older side of the DAF process exhibits heavy wear and corrosion of many components, so the equipment has exceeded the expected service life and must be replaced. The newer side of the DAF unit is also showing signs of heavy wear and is in need of new system scraper components and a drive unit. Additionally, the inside of the DAF unit tank will require a structural liner to strengthen and seal existing cracks in the concrete. As of November 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$4,500,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
To Be Determined, Sunrise, FL
Related To This Project
Sunrise, FL
Bid Date: Jan 13 2023
Sunrise, FL
Bid Date: Dec 19 2022
Sunrise, FL
Bid Date: Dec 09 2022
Sunrise, FL
Bid Date: Dec 13 2022
Sunrise, FL
Bid Date: Jan 06 2023
Sunrise, FL
--
Sunrise, FL
Bid Date: Jan 10 2023
Sunrise, FL
Bid Date: Dec 22 2022
Sunrise, FL
Bid Date: Dec 13 2022
Sunrise, FL
Bid Date: Dec 13 2022
Sunrise, FL
Bid Date: Jun 28 2022
Sunrise, FL
Bid Date: Nov 15 2022
Sunrise, FL
--
Sunrise, FL
Bid Date: Nov 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.