BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a fire / police facility in Philadelphia, Pennsylvania. Completed plans call for site work for a fire / police facility.

Remove and process the rubber from Firing Ranges 2,3, and 4 with minimal disruption to the training schedule. separate rubber material from lead and other contaminates. Re-apply the screened rubber to the ranges and create a uniform surface with at least 24 inches of rubber. Supply new rubber to achieve the 24 inch required depth. Ensure that each range has at leat 24 inches of rubber spread across each backstop. The rubber will be 25mm all black, metal and fiber free. Rubber will be coated with calcium carbonate, fire retardant. All lead will be recycled. Dispose of all metallic lead and materials according to applicable regulations. Perform all work within accordance with OSJA requirements and consistent with standard protocol for remediation of outdoor ranges. All workers shall be trained in the handling of lead contaminate material. Monitor air quality during project. A final report to the Philadelphia Police Department to include air monitoring results, hazardous waste disposal and amount of lead recycled. Contractor will be responsible for the transportation and disposal of the hazardous materials. All work will comply with OHSA regulations concerning lead exposure in constructions standard. The contractor will be responsible for all damages to the ranges that they may cause. Fiscal Year: 20 Please direct all questions to April Jones via phone or e-mail Allow Electronic Quote: Yes

Award

Fire / Police

$30,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
760
Active Projects
141
Bidding Soon
6,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2019

January 6, 2020

Project location map

To Be Determined, Philadelphia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.