BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Birmingham, Alabama. Completed plans call for site work for a water / sewer project.

**As of February 27, 2020, this project has not yet been awarded. A timeline for award has not yet been established. Estimated Value: $1.5M to $1.8M The scope of work includes the rehabilitation of approximately 187 sanitary sewer service laterals with cured-in-place liner, replacement of 24 laterals with excavation, 20 cleanout installations, 7,697 linear feet of 8-inch mainline cured-in-place liner, 282 vertical feet of manhole rehabilitation, asphalt paving and restoration work. Bidding Documents are on file for inspection in the following locations: Environmental Services Department 716 Richard Arrington Jr. Boulevard North, Suite A-300 Birmingham, Alabama 35203. Contact for Appointment: John Willett at (205) 325-3060. Bids will only be accepted from pre-qualified contractors who are listed on the Plan Holders List, signifying that they have purchased a set of documents from the Engineer, and who attend the MANDATORY Pre-Bid Conference. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project. The Contract Time for this project is two hundred seventy (270) consecutive calendar days from the effective date of the written Notice to Proceed to achieve Final Acceptance. Liquidated damages will be assessed if this time limit is exceeded. The Contractor may apply for an extension of time in accordance with the provisions of the Contract; however, such an extension must be approved prior to the Contract Completion Date to avoid the imposition of liquidated damages. Questions concerning meaning or intent of Bidding Documents shall be submitted to Tad Powell, PE, Associate, Hazen and Sawyer, at email tpowell@hazenandsawyer.com no later than 5:00 p.m. local time on January 10, 2020. All questions must be in writing on Bidder's company's letterhead.

Bid Results

Water / Sewer

$1,396,437.00

Public - County

Renovation, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
543
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2020

March 23, 2020

img_map_placeholder

Multiple Locations, Birmingham, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.