BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a civil project in Marana, Arizona. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The work is located in Pima County and Town of Marana, AZ and the scope of the NWRRDS project is to provide all labor, materials, equipment and supplies necessary to construct: NWRRDS Transmission Main and Forebay Facility, M-19-003, to include approximately 38,000 LF of new 24-inch transmission main; approximately 750 LF jack and bore using 42" sleeve; 1-million gallon above-ground welded steel storage tank; tablet chlorination system; new building to house operations room and tablet chlorination system; yard piping with associated fittings and appurtenances; electrical, instrumentation, control, and security elements; and associated infrastructure and improvements. NWRRDS Recovery Well Equipping and Collector Pipelines, M-19-006 to include equipping 2 groundwater recovery wells; 2 hydro pneumatic tanks; 2 tablet chlorinator systems; yard piping with associated fittings and appurtenances; approximately 8,500 LF of 20-inch ductile iron transmission main; approximately 1,500 LF of 24-inch transmission main; and associated infrastructure and improvements. NWRRDS Transmission Main and Forebay Facility, M-19-003 - $ 22,614,683 NWRRDS Well Equipping and Collector Piping, M-19-006 - $ 8,678,094 The Work consists of construction of Northwest Recharge, Recovery, and Delivery System (NWRRDS) recovery wells, hydropneumatic tanks, chlorinators, collection pipes and associated infrastructure, consisting of the following: 1. Approximately 8,500 linear feet of 20-inch transmission main. 2. Approximately 1,500 linear feet of 24-inch transmission main. 3. Two hydropneumatic tanks with air compressors and control systems. 4. Two tablet chlorination systems with fiberglass enclosures. 5. Tie into existing BKW Farms facilities for pump to waste. 6. Yard piping with associated fittings and appurtenances. 7. Electrical, instrumentation, and control, and security elements. 8. Necessary civil and site work for complete and usable facility. 9. In addition to the above description, the Work includes repair and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility The Work is located at: 1. The three recovery well sites are located near the Marana Airport, and all feed into a single collection pipe. 2. The collection pipes begin at three well sites near the Marana Airport and run to a transmission main to be constructed as part of a separate project. Bid Results :: BID SCHEDULE A :: Granite Construction Company :: $ 31,290,532.66 BID SCHEDULE B :: Granite Construction Company :: $ 11,447,052.00

Bid Results

Water / Sewer

$42,737,584.00

Public - City

New Construction, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
28
Bidding Soon
964
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 10, 2022

Project location map

Multiple Locations, Marana, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.