Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Marana, Arizona. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The work is located in Pima County and Town of Marana, AZ and the scope of the NWRRDS project is to provide all labor, materials, equipment and supplies necessary to construct: NWRRDS Transmission Main and Forebay Facility, M-19-003, to include approximately 38,000 LF of new 24-inch transmission main; approximately 750 LF jack and bore using 42" sleeve; 1-million gallon above-ground welded steel storage tank; tablet chlorination system; new building to house operations room and tablet chlorination system; yard piping with associated fittings and appurtenances; electrical, instrumentation, control, and security elements; and associated infrastructure and improvements. NWRRDS Recovery Well Equipping and Collector Pipelines, M-19-006 to include equipping 2 groundwater recovery wells; 2 hydro pneumatic tanks; 2 tablet chlorinator systems; yard piping with associated fittings and appurtenances; approximately 8,500 LF of 20-inch ductile iron transmission main; approximately 1,500 LF of 24-inch transmission main; and associated infrastructure and improvements. NWRRDS Transmission Main and Forebay Facility, M-19-003 - $ 22,614,683 NWRRDS Well Equipping and Collector Piping, M-19-006 - $ 8,678,094 The Work consists of construction of Northwest Recharge, Recovery, and Delivery System (NWRRDS) recovery wells, hydropneumatic tanks, chlorinators, collection pipes and associated infrastructure, consisting of the following: 1. Approximately 8,500 linear feet of 20-inch transmission main. 2. Approximately 1,500 linear feet of 24-inch transmission main. 3. Two hydropneumatic tanks with air compressors and control systems. 4. Two tablet chlorination systems with fiberglass enclosures. 5. Tie into existing BKW Farms facilities for pump to waste. 6. Yard piping with associated fittings and appurtenances. 7. Electrical, instrumentation, and control, and security elements. 8. Necessary civil and site work for complete and usable facility. 9. In addition to the above description, the Work includes repair and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility The Work is located at: 1. The three recovery well sites are located near the Marana Airport, and all feed into a single collection pipe. 2. The collection pipes begin at three well sites near the Marana Airport and run to a transmission main to be constructed as part of a separate project. Bid Results :: BID SCHEDULE A :: Granite Construction Company :: $ 31,290,532.66 BID SCHEDULE B :: Granite Construction Company :: $ 11,447,052.00
Bid Results
Water / Sewer
$42,737,584.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2022
May 10, 2022
Multiple Locations, Marana, AZ
Related To This Project
Marana, AZ
Bid Date: May 13 2022
Marana, AZ
Bid Date: May 11 2022
Marana, AZ
Bid Date: Jun 03 2022
Marana, AZ
--
Marana, AZ
--
Marana, AZ
Bid Date: Sep 03 2020
Marana, AZ
Bid Date: Jun 28 2022
Marana, AZ
Bid Date: Mar 28 2022
Marana, AZ
Bid Date: Jul 13 2023
Marana, AZ
Bid Date: Apr 12 2022
Marana, AZ
--
Marana, AZ
Bid Date: Jan 19 2023
Marana, AZ
Bid Date: Dec 13 2022
Marana, AZ
Bid Date: Jun 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.