BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work and new construction of a water / sewer project in Friendswood, Texas. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Complete reconstruction of the Lift Station #1 and #17 facilities would include wet well, pumps and controls. The reuse of existing generator is possible. The new installation would replace a facility over 30 years old and in deteriorating condition. In general terms, the project would have within its definition the installation of three submersible sewage pumps of the 15 to 20 HP range, controls and associated instrumentation should be in stainless enclosures and placed above the flood level. A new fence should also be included in this project. The current 480 Volt, 3 Phase 150 amp service and natural gas for the generator is existent at this site. As of February 3, 2022, this project is currently in the FY 2021 -2022 CIP . Funding for this project is allotted in the City of Friendswood capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,594,000.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
218
Bidding Soon
3,630
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

Project location map

To Be Determined, Friendswood, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.