Site work and paving for a road / highway in West Bend, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Approximate quantities are as follows: Excavation Common 29,850 CY Borrow 2,750 CY Base Aggregate Dense 14,600 TON Breaker Run 6,500 TON HMA Pavement 3,700 TON Culvert Pipes 420 LF Concrete Curb & Gutter 150 LF Salvaged Topsoil 45,800 SY Epoxy Pavement Markings 11,500 LF The project is expected to begin August 10, 2020 and shall be substantially completed by October 23, 2020, and shall be fully completed by November 6, 2020. Construction time is of the essence. Completion delays are subject to liquidated damages. Bid Bond (Required) - No bid shall be received unless accompanied by a certified check or bid bond equal to five (5%) percent of the bid, payable to Washington County Treasurer, as a guarantee that if the bid is accepted, the successful bidder will execute and file the contract within ten (10) days after the award of the contract. If you are submitting a 5% certified check in lieu of the bid bond, include a completed and signed copy of your firm's current W-9 Form with your sealed bid. In case the bidder fails to file such contract, the amount of the check or bid bond shall be forfeited and become the property of Washington County. Failure to submit the required bid security as part of the firm's sealed bid will result in immediate rejection of the firm's bid. The accepted bidder will also be required, as a condition precedent to award of contract, to furnish in the amount of 100% of the contract price, satisfactory Performance & Payment Bonds and Certificate of Insurance. As per Section 2015 Act 55, the County is not required to establish a rate of wage scale for this project. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. All bidders must include the "Bidders Qualification Statement," as part of their sealed response. If the Bidder Qualification Statement is missing, the bid may be rejected. Washington County reserves the right to waive any informalities or technicalities and to reject any and all bids or parts thereof deemed to be unsatisfactory or not in the County's best interest. Furthermore, Washington County reserves the right to cancel any order or contract for failure of the successful bidder to comply with the terms, conditions and specifications of the bid request and/or contract. Washington County reserves the right to award the bid in the aggregate or by item or like item groups (where applicable) to the lowest responsible, responsive bidder who complies with the specifications, service and can meet the requirements of this request.

Award

Roads / Highways

$825,967.00

Public - County

Paving, Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
117
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2020

August 10, 2020

Project location map

Co Rd D, West Bend, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.