Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Farmington, Utah. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
A bid bond in the amount of five percent (5%) of the bid amount, made payable to the Division of Facilities Construction and Management on the AIA Document A310 - 2010 Bid Bond, or equivalent, shall accompany the bid submission and in U3P. If the bid bond is not uploaded with the bid through U3P, the bid is NONRESPONSIVE. The performance and payment bonds shall be for an amount equal to one hundred percent (100%) of the contract sum and secured from a company that meets the requirements specified in the requisite forms. Any bonding requirements for subcontractors will be specified in the Supplementary General Conditions. The Division of Facilities Construction and Management reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the State. DFCM Project Manager: Lucas Davis , 801-842-8210 , lucasdavis@utah.gov Five bridge replacements at Farmington Bay WMA, Ogden Bay WMA, and Salt Creek WMA per plans and specifications. Construction Cost Estimate: $375,000 Liquidated Damages: $250 Question Submission Close Date 2/17/2020 3:00 PM MST
Final Planning
Bridges / Tunnels
$494,478.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2020
March 26, 2020
Multiple Locations, Farmington, UT
Related To This Project
Farmington, UT
--
Farmington, UT
Bid Date: Feb 25 2021
Farmington, UT
Bid Date: Dec 13 2023
Farmington, UT
Bid Date: Dec 18 2023
Farmington, UT
Bid Date: Feb 01 2024
Farmington, UT
Bid Date: Feb 07 2024
Farmington, UT
Bid Date: Feb 27 2024
Farmington, UT
--
Farmington, UT
Bid Date: Apr 09 2020
Farmington, UT
--
Farmington, UT
Bid Date: Oct 18 2023
Farmington, UT
Bid Date: Sep 27 2022
Farmington, UT
Bid Date: Sep 02 2022
Farmington, UT
--
Farmington, UT
Bid Date: Sep 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.