BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 17, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Baton Rouge, Louisiana. Design plans call for site work for a road / highway; and for paving for a road / highway.

his project proposes to enhance pedestrian, transit, and bicycle safety and mobility by improving the existing corridor to better accommodate the Complete Streets needs in the area. Drainage and vehicular turning movement improvements are also a priority along the corridor. Green Infrastructure and Railroad crossing improvements will also be considered. The MOVEBR Program will work with the selected consultants, DOTD, business owners, public stakeholders, and local interest groups for this project. The MOVEBR Transportation and Infrastructure Improvements Program is the most significant transportation infrastructure investment in East Baton Rouge Parish history. The 1/2 cent sales tax proposition was approved by the voters of East Baton Rouge Parish on December 8, 2018. The tax became effective on April 1, 2019 and will continue for 30 years until March 31, 2049. As of October 17, 2023, the project is in design. Letting is tentatively scheduled for 2025.* *For more information on MoveBR project, please refer to https://movebr.brla.gov/page/project-list

Design

Roads / Highways

$7,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
0
Bidding Soon
372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

Project location map

Scenic Hwy, Baton Rouge, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.