BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Ellensburg, Washington. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The anticipated bonding capacity required to execute the project is estimated to be in the $1,000,000 to $2,000,000 range. Bid improvements consist of concrete lining, drainage, earthwork and other work, all in accordance with the contract plans, the contract provisions, and the specifications. The improvements are for construction of water conservation and operational improvements to the KRD system. Requested base bid (Phase NIB) and pre-priced optional bid (Phase MIC) work follow the existing North Branch Canal alignment for a distance of approximately 0.4 miles from the outlet of Siphon No. 6 to the Inlet of Tunnel No. 5. The Project has been divided into two distinct sections to allow for funding phased award as needed. The base bid improvements in these documents are for canal lining of Phase DIB, described as work related to canal lining and improvements between Stations 1738+70 and Station 1744+02.44 (station equation). It is the District's desire to line the remaining reach of the canal downstream of Station 1753+25.20 (station equation) by the start of the 2021 Irrigation Season. Pricing of the additional Phase MIC is requested for optional award at the discretion of KRD. Optional award will depend on a variety of factors, including, but not limited to, weather, cost, Contractors work plan, demonstrated productivity on Phase IIIB, and the anticipated start of the irrigation seasons on or about April 15, 2020 and April 1, 2021. This optional pricing will be factored into evaluation of apparent low bidder. The District specifically reserves the right, in its sole discretion, to reject any or all Bids or re-Bids or to waive inconsequential deviations from Bid requirements not involving time, price, or work quality. Bidders are solely responsible for the cost of preparing their Bids.

Award

Water / Sewer

$1,191,540.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
3
Bidding Soon
190
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2020

February 18, 2020

img_map_placeholder

Multiple Locations, Ellensburg, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.