Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 4, 2020 at 8:00 PM
Updated January 26, 2024
Renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a 172,000-square-foot, 30-story above grade educational facility; and 43,500-square-foot, three-story above grade educational facility.
Women Goal: 10% Minority Goal: 29% This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of the renovation of Sandburg Residence Hall North Tower and sprinklering the Sandburg Residence Hall Commons. North Tower is 27-stories of student residences, 1-story of office, laundry, storage and mechanical spaces, and 2-stories of mechanical, radio equipment, and elevator penthouses. North Tower floor plan footprint is approximately 6,100 gsf with each penthouse an additional 1,100 GSF for a total GSF of 172,000. The Commons is 2-stories of student use and building administrative areas and a mechanical penthouse. The Commons floor plan footprint is approximately 38,000 gsf with a 5,500 GSF penthouse.The renovation work entails bathroom renovation work including fixture and finishes replacement, plumbing, mechanical, electrical, fire suppression, and limited fire alarm system replacement. Work outside of the bathrooms includes air distribution system replacement, life safety enhancements, and elevator renovation including added stops on student occupied floors. The work will occur in phases. Phase 1 will include floors 9-26, elevators, portions of the Lower Parking level mechanical and storage spaces, and the penthouses. Phase 2 will add floors 1-8, the balance of the Lower Parking level, and the Upper Parking level after they are vacated by students after the academic year. Bid Result Electrical Aldridge Electric, Inc. $662,995 Plumbing Butters Fetting Co. Inc. $1,978,000 HVAC J & H Heating Inc $1,073,041 Fire Protection United States Alliance Fire Protection $1,901,024 Total - $5,615,060
Award
Educational
$11,503,807.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2020
May 18, 2020
3400 N Maryland Ave, Milwaukee, WI
Related To This Project
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Mar 29 2024
Milwaukee, WI
Bid Date: Nov 08 2023
Milwaukee, WI
Bid Date: Nov 30 2023
Milwaukee, WI
Bid Date: Nov 30 2023
Milwaukee, WI
Bid Date: Nov 04 2021
Milwaukee, WI
Bid Date: Jun 29 2021
Milwaukee, WI
Bid Date: Apr 07 2021
Milwaukee, WI
Bid Date: Dec 21 2020
Milwaukee, WI
Bid Date: Apr 19 2024
Milwaukee, WI
Bid Date: Oct 23 2023
Milwaukee, WI
Bid Date: Oct 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
