Site work and paving for a mixed-use development in Coto de Caza, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of March 13,2020, this project is awarded to R.J. NOBLE COMPANY, INC. in the amount of $480,311.20.** In general, the work is comprised of mobilization, traffic control, best management practices, removal and recycling of existing AC pavement, preparation of subgrade, placement and compaction of base, installation of geogrid subgrade and aggregate base reinforcement, AC paving, placement of pavement reinforcement, removal and replacement of PCC sidewalk, removal and replacement of PCC curb and gutter, removal and replacement of driveway curb cuts, and other miscellaneous improvements as shown on the plans and as required to complete the work. The general location and limits of the work are on Vista Drive from Robinson Ranch Road to the end of the Vista Drive cul-de-sac, as shown on the plans The City reserves the right after opening bids to reject any or all bids, to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder on the Bid Schedule, and reject all other bids, as it may best serve the interest of the City. Within three (3) days of bid opening contractor must submit a revised bid bond with numerical dollar values, both in words and with digits of bid amount. Within five (5) working days after the date of the Notice of Apparent Low Bidder, the successful bidder will be required to submit required Contract Agreement and Insurance. Within ten (10) working days after the date of the Notice of Award, the successful bidder will be required to submit Bonds (Faithful Performance and Material and Labor), Construction Schedule, Traffic Control Plan and Water Pollution Prevention Plan. The Contractor shall possess a valid Class A Contractor's License at the time of submitting bids, in accordance with provisions of Chapter 9, Division III of the California Business and Professions Code. The wage rates applicable to this Project are the State of 'California Department of Industrial Relations prevailing rates of per diem wages. In accordance with the provisions of Sections 1773.2 of the California Labor Code, copies of the general prevailing rate of per diem portal under Statistics and Research. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any subcontractor to .pay not less than said specified rates to all workers employed by them in the execution of the contract. A copy of said rates shall be posted at each job site during the course of construction. The Contractor and all subcontractors shall comply with all provisions of the California Labor Code relating to prevailing wage rates, including Sections 1770-1781. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The Department of Industrial Relations shall monitor and enforce compliance with applicable prevailing wage requirements for the contract. The reporting requirements may be found at portal. The Contractor is responsible for complying with all requirements of the Department of Industrial Relations, including filing electronic payroll reports. A contractor or subcontractor will not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of o the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payments by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. If the Contractor chooses not to exercise its rights under Public Contract Code Section 22300, the full five percent (5%) retention will be deducted from all payments. The final retention will be authorized for payment thirty-five (35) days after the date of recordation of the Notice of Completion, if no stop notices have been filed. The City may withhold from release of the final retention amounts authorized under Public Contracts Code Section 7107 and/or 125% of amounts identified in any Stop Notices received by the City. For any questions regarding acquisition of Contract Documents, contact Wilson Leungg wleungacityofrsm.orq.

Award

Roads / Highways

$480,311.00

Public - City

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
112
Bidding Soon
2,451
All Active Projects
1,096
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2020

March 26, 2020

img_map_placeholder

Vista Dr, Coto de Caza, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.