Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work, paving and outdoor lighting for a mixed-use development in Williamsburg, Virginia. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
UPDATE : Smart18 - Ironbound Road Improvements - Phase 3 Reconstruction w/ Added Capacity Description FROM: Treyburn Drive TO: DePue Drive Project is in Virginia Department of Transportation (VDOT capital budget fy 2026-2031 CIP ____________________________________________________________________________________ Update:https://www.williamsburgva.gov/DocumentCenter/View/6716/H---CIP-FY25---INTERACTIVE Ironbound Road Improvements is divided into three phases. Phase I included the redesign of the Longhill Road intersection and the relocation of Longhill Road. This phase was completed in FY19. Phases II & III of the Ironbound Road project will be completed concurrently due to available funding. The combined project includes the redesign and widening from Middle Street to Depue Drive. The planned improvement includes a roadway with three lanes, pedestrian/bicycle improvements, streetlights, underground wiring, and the creation of dual left turn lanes at the Richmond Road intersection. The project also includes coordination of the traffic signals at Richmond Road, Longhill Road, and Treyburn Drive. This project will be completely funded through the VDOT federal-aid Smart Scale program for a total cost of $5,235,100 in FY24-FY26. Project is included City of Williamsburg Fiscal Year 2025-2029 Page no 23 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Ironbound Road Improvements is divided into 3 phases. Phase I included the redesign of the Longhill Road intersection and the relocation of Longhill Road. This phase was completed in FY19. Phases II & Ill of the Ironbound Road project will be completed concurrently due to available funding. The combined project includes the redesign and widening from Middle Street to Depue Drive. The planned improvement includes a roadway with three (3) lanes, pedestrian/ bicycle improvements, streetlights, underground wiring, and creating dual left turn lanes at the Richmond Road intersection. The project also includes coordination of the traffic signals at Richmond Road, Longhill Road, and Treyburn Drive. This project will be completely funded through the VDOT federal-aid Smart Scale program for a total cost of $5,235,100 in FY23-FY26. As of June 28, 2022, this project is included in the City of Williamsburg FY 2022-2026 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,744,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2030
Ironbound Rd, Williamsburg, VA
Related To This Project
Williamsburg, VA
Bid Date: Sep 19 2023
Williamsburg, VA
Bid Date: Oct 03 2023
Williamsburg, VA
--
Williamsburg, VA
Bid Date: Nov 30 2023
Williamsburg, VA
Bid Date: Dec 13 2023
Williamsburg, VA
Bid Date: Aug 12 2022
Williamsburg, VA
Bid Date: Sep 06 2022
Williamsburg, VA
--
Williamsburg, VA
Bid Date: May 24 2022
Williamsburg, VA
Bid Date: Apr 08 2022
Williamsburg, VA
Bid Date: Mar 17 2022
Williamsburg, VA
--
Williamsburg, VA
Bid Date: Mar 31 2022
Williamsburg, VA
Bid Date: Mar 09 2022
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
