BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Hastings, Minnesota. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Major Quantities Include: Remove Bituminous Pavement 2,527 Sq Yd, Dredging of Harbor and Channel Haul to Waste 2,045 Cu Yd, Select Granular Embankment (CV) (P) 755 Cu Yd, Type SP 9.5 Wearing Course Mixture (3,C) 966 Ton, Boat Launch Ramp Mix Design (P) 112 Cu Yd, Ornamental Metal Railing 240 Lin Ft, Concrete Switchback Wall 244 Lin Ft, 6' Concrete Walk 1,952 Sq Ft, and Concrete Curb and Gutter 3,324 Lin Ft.

Award

Playgrounds / Parks / Athletic Fields

$1,654,682.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
82
Bidding Soon
1,557
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

September 6, 2022

Project location map

10191 St Croix Trail S, Hastings, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.