Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Oak Creek, Wisconsin. Design plans call for the renovation of a water / sewer project.
The purpose of this project is to ensure performance and reliability in removing scum and solids from the influent wastewater. The project scope consists of two alternatives: design and construction of the removal and in-kind replacement of Primary Clarifier (PC) Nos. 1-16, or design and construction of the removal and in-kind replacement of only eight out of the 16 PC units combined with the addition of a chemical or biological enhanced primary treatment system. Conditions of the existing equipment include warped scum beaches, warped and misaligned longitudinal and cross collectors, and corroded drives. The project will ensure reliable operation with regards to scum and solids removal. The change in total project cost is due to refined cost estimates. The first alternative will have no operating budget impact while the second alternative will have a savings of $2.6M a year. The project is included in the 2021-2026 Capital Improvement Program (CIP). As August 23, 2024, further details regarding design and construction have not been identified. Construction is expected in 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$13,986,087.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
January 1, 2029
8500 5th Ave, Oak Creek, WI
Related To This Project
Oak Creek, WI
Bid Date: Sep 25 2024
Oak Creek, WI
--
Oak Creek, WI
--
Oak Creek, WI
Bid Date: Sep 12 2024
Oak Creek, WI
Bid Date: Sep 20 2024
Oak Creek, WI
Bid Date: Aug 23 2024
Oak Creek, WI
Bid Date: Aug 30 2024
Oak Creek, WI
Bid Date: Aug 15 2024
Oak Creek, WI
Bid Date: Aug 15 2024
Oak Creek, WI
Bid Date: Aug 15 2024
Oak Creek, WI
--
Oak Creek, WI
--
Oak Creek, WI
--
Oak Creek, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--