BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2023 at 7:00 PM

Updated January 26, 2024

Site work, paving and addition to a civil project in Phillipsburg, Kansas. Conceptual plans call for paving for a road / highway; and for the addition of a bridge / tunnel.

***The contact(s) will not accept phone call inquiries at this time.** This project is part of "Forward" is a new transportation plan that will address the state's transportation needs. The first items included in the new plan will be the nearly 25 projects that were suspended in the current 10-year plan, called T-Works. Project number: KA-2372-02 County: Phillips Location:K-383: From NT/PL Co Line, NE to Br #051 (Prairie Dog Cr) Miles: 9.5 Scope: 2-Lane reconstruction of K-383 in Phillips County. This project includes 2 RCB bridges (#026 and #027) that will be extended. As of January 4, 2023, further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$23,951,936.00

Public - State/Provincial

Addition, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

Project location map

KS-383, Phillipsburg, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.