BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

As of May 19, 2022, this project started the demolition phase in January 2022 and ER 2 phase in February 2022. As of July 2021, this project has been delayed. Bid packages now will be released spring 2022. It's not yet known if bidding information will be shared with plan rooms or what the prequalification procedure is for subcontractors and suppliers. As of February 11, 2021, project is still in design. 60% design drawings anticipated by mid summer and bid packages will begin to be released at that time. It's not yet known if bidding information will be shared with plan rooms or what the prequalification procedure is for subcontractors and suppliers. From Original RFP for CMAR: The Scope for Project 19005 consists of two portions: Preliminary Treatment and Primary Treatment. Preliminary Treatment The new facilities will consist of 3 channels, 2 bar screens, rock catcher, 3 inlet gates, a dual hydraulic sluiceway, 2 washer/compactors, screening storage building and bins, 4 aerated grit basins, 12 grit pumps, 12 grit hoppers, grit storage building and bins, interceptor split structure and a flow metering vault. The Project will require a tie into the existing splitter structure and three 96" pipes approximately 365 linear feet in length. At the outlet, two 72" pipes approximately 370 linear feet in length connect to Primary Treatment Structures. Primary Treatment The new facilities will consist of a primary influent structure, three 120-foot diameter primary clarifiers with a 14-foot side water depth, 6 scum pumps, sludge pumps, sludge pumping facility, drain pumps, primary outlet structures, and odor control facility. From the primary outlet structure a 96" pipe will need to be extended to the existing 72" pipe that leads to the Primary Effluent Pump Station facility. From the primary sludge pumping facility approximately 2,400 ft of 10" lines will be required to convey primary sludge to the existing sludge thickening facilities. OPINION OF PROBABLE CONSTRUCTION COST (OPCC): $126,000,000 to $144,000,000. Bid Bond: 10%

Award

Water / Sewer

$144,000,000.00

Public - County

New Construction, Site Work

183

127

28

9

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
17
Bidding Soon
430
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2020

January 31, 2022

Project location map

To Be Determined, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.