BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2024 at 7:00 PM

Updated January 29, 2024

Site work, paving and outdoor lighting for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Contract 1: Breakwater Construction; 575 Linear Feet of Stone Revetment, and 37,100 SF (0.85 AC) of fill material (stone) placed into Lake Michigan to maintain a revetment for the purpose of erosion control at the North Point Parking Lot next to Bradford Beach. The Target Enterprise participation goal for this project is 10%. To be considered for this project, you must submit Subcontractor/Sub-consultant/Supplier Information with your Bid/Proposal listing all subcontractors as well as signed Commitment to Contract with TBE (TBE-14) forms, one for each of the TBE firms included to meet participation. TBE-14 form(s) must identify (1) the TBE firm by name and address, (2) the scope of work/service(s) to be provided, (3) the dollar amount of such work, and (4) the percentage. The form is first completed and signed by the Prime, then forwarded to the TBE subcontractor for signature in the affirmation section. Signatures must occur in the proper date order sequence, or the form may be considered non-responsive. OEI is entitled to reject your bid for improperly completed forms. If you are not able to meet the goal, you must submit the TBE-01 Good Faith Effort with the bid for your bid to be considered. Per Adda 1 : bid date extended Written questions can be submitted to the Community and Economic Development Director, Jonathan Weidenhamer at jweidenhamer@sslc.gov and copied to Kerryn Talbot at ktalbot@sslc.gov and copied to David Milne at dem@mocasystems.com before 5:00 p.m. on December 15th , 2023. Responses to written questions will be posted via an Addendum on U3P/SciQuest by 5:00 p.m on December 19th . There is a non-mandatory Prequalification Meeting for this project on December 14th , 2023 at 11:00 am.

Post-Bid

Roads / Highways

$1,326,060.00

Public - County

Outdoor Lighting, Paving, Site Work

29

20

24

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
175
Bidding Soon
1,954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2023

February 19, 2024

Project location map

2272 N Lincoln Memorial Dr, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.