BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Cahokia, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of January 23, 2023, an engineer has been selected and this project is in the design development phase. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This project may contain Federal Funds. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on May 6, 2020at 1:00 PM at the Region Five/District Eight offices in Collinsville. This project consists of the pavement rehabilitation and bridge repair of two sections of I-255. The first section is from IL 157 to IL 15 and the next section is from IL 3 in Dupo to IL 157. Phase II engineering services required for this project include the preparation of all Plans, Specifications and Estimates (PS&E documents). Additional items include but are not limited to supplemental surveys, public involvement, maintenance of traffic plans, sign truss repairs, noise wall repairs, concrete median replacement, bridge approach re-profiling, guardrail upgrades, drainage upgrades, storm water pollution prevention plan, erosion control plans, roadway lighting plans, and all other necessary related work to complete Phase II. Items to be provided from the Phase I engineering services include a Project Report, land surveys, traffic management analysis, utility coordination and correspondence, Abbreviated Bridge Condition Reports, and all other work associated with the approved Project Report The estimated construction cost for this project is $74,000,000. The completion date for this contract will be 84 months after authorization to proceed. Statements of Interest including resumes of the key people noted above must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS) Questions concerning this Bulletin should be directed to: E- mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 47 - RFQ Engineering - Bridge Replacement on IL 57 over MillCreek at Marblehead, Phase I and II Engineering Services

Design

Bridges / Tunnels

$74,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
119
Bidding Soon
1,394
All Active Projects
630
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 27, 2024

February 26, 2028

img_map_placeholder

I-255, Cahokia, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.