BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Chesapeake, Virginia. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Old Mill Road Bridge Replacement corridor from east of Cooks Mill Road to east of Jean Court is a major arterial two-lane uniform roadway section. The purpose of this project, funded by the VA Department of Transportation (VDOT) State of Good Repair (SGR) program funds, is to replace structurally deficient bridge infrastructure crossing Deep Creek while making needed stormwater drainage improvements. The project limits are along Old Mill Road from 300 feet east of Cooks Mill Lane to 200 feet east of Jean Court. Roadway improvements include the widening along both sides of Old Mill Road to increase the lane width within the project area to improve safety. In addition to replacing the structurally deficient bridge, the vertical alignment will be raised to mitigate roadway flooding. Drainage ditches will be added to alleviate ponding adjacent to the roadway. On June 12, 2018, City Council amended the CIP to add this as a new project for FY 2019. VDOT grant funding totaling $1,153,000 was awarded to complete this project, beginning in FY 2019 and ending in FY 2025. (VDOT awarded $39,000 in FY 2019, $98,000 in FY 2020, and $1,016,000 in 2021). An additional $804,000 was added for FY 2024 due to price increases based on a Right-of-Way estimate that was recently completed. This project is included in the city’s 2024-2028 Capital Improvement Plan. As of March 19, 2024, project funded for FY2024. Design was completed in Fall 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$1,918,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
592
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

Old Mill Rd, Chesapeake, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.