BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2023 at 7:00 PM

Updated February 20, 2025

Site work and paving for a mixed-use development in Stillwater, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

Major Quantities include: Remove Curb & Gutter 11,233 Lin Ft, Remove Concrete Walk 3,441 Sq Yd, Excavation-Common 6,891 Cu Yd, Aggregate Base (CV) Class 5 4,007 Cu Yd, Mill Bituminous Surface (2.0") 20,190 Sq Yd, Type 12.5 Bituminous Mixtures 7,047 Ton, RC Pipe Sewer Des. 3006 (12"-18") 1,241 Lin Ft, Const. Drainage Structure Des. 48-4020 122 Lin Ft, Concrete Walk (4"-6") 50,504 Sq Ft, Concrete Curb & Gutter 10,604 Lin Ft, 6" Concrete Driveway Pavement 1,693 Sq Yd, Truncated Domes 1,102 Sq Ft, and Sign 383 Sq Ft, 4" Solid Line Multi. Comp. Gr. In. (WR) 11,905 Lin Ft. B1803599, 20-10509, 2019-09

Bid Results

Sidewalks / Parking Lot

$3,201,422.00

Public - County

Paving, Site Work

190

15

14

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
173
Bidding Soon
1,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

May 1, 2023

Project location map

Multiple Locations, Stillwater, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.